Cable Panel 35. Skill Level: Advanced knitter and up. Knit with 50 stitches and 28-row repeat.
Cable Knitting Pattern 35
MAKE KNOT 
- (K1, p,1, k1, p1, k1, p1, k1) in one stitch, then with point of left needle pass the 2nd, 3rd, 4th, 5th, 6th and 7th stitches on right needle over the last stitch, one at a time.
TOP AND BOTTOM BORDER
50 stitches.
Right side: P9, k6, p6, k1, p2, k1, p3, k1, p6, k6, p9.
Wrong side: K9, p6, k6, p1, k3, p1, k2, p1, k6, p6, k9.
The Art of CABLE KNITTING -free pattern 35
PATTERN
50 stitches.
Row 1 (RS): P9, 3/3 RC, p6, k1, p2, k1, p3, MK, p6, 3/3 LC, p9.
Rows 2, 4, 6, 8, 10, 12, 14, 16, 18, 20, 22, 24, 26, and 28: Knit the knit stitches and purl the purl stitches
Row 3: P7, 3/2 RPC, 3/1 LPC, p2, MK, p2, 1/1 LPC, p1, k1, p3, k1, p5, 3/1 RPC, 3/2 LPC, p7.
Row 5: P5, 3/2 RPC, p3, k3, p2, 1/2 LPC, p1, 1/1 LPC, k1, p1, 1/2 RPC, p2, MK, p2, k3, p3, 3/2 LPC, p5.
Row 7: P3, 3/2 RPC, p4, 3/1 RPC, p4, 1/2 LPC, 1/1 LPC, 1/1 RPC, p2, 1/2 RPC, p2, 3/1 LPC, p4, 3/2 LPC, p3.
Row 9: P2, 3/1 RPC, p4, 3/2 RPC, p7, 1/1 LPC, 1/1 RPC, p1, 1/2 RPC, p5, 3/2 LPC, p4, 3/1 LPC, p2.
Row 11: P2, k3, p3, 3/2 RPC, p10, 1/1 LPC, 1/2 RPC, p9, 3/2 LPC, p3, k3, p2.
Row 13: P2, 3/1 LPC, 3/2 RPC, p12, 1/2 LPC, p2, MK, p10, 3/2 LPC, 3/1 RPC, p2.
Row 15: P3, 3/3 RC, p12, MK, p3, k1, p2, k1, p12, 3/3 LC, p3.
Row 17: P2, 3/1 RPC, 3/2 LPC, p10, k1, p3, k1, p1, 1/1 RPC, p2, MK, p7, 3/2 RPC, 3/1 LPC, p2.
Row 19: P2, k3, p3, 3/2 LPC, p5, MK, p2, 1/2 LPC, p1, k1, 1/1 RPC, p1, 1/2 RPC, p5, 3/2 RPC, p3, k3, p2.
Row 21: P2, 3/1 LPC, p4, 3/2 LPC, p3, 1/2 LPC, p2, 1/1 LPC, 1/1 RPC, 1/2 RPC, p5, 3/2 RPC, p4, 3/1 RPC, p2.
Row 23: P3, 3/2 LPC, p4, 3/1 LPC, p4, 1/2 LPC, p1, 1/1 LPC, 1/1 RPC, p6, 3/1 RPC, p4, 3/2 RPC, p3.
Row 25: P5, 3/2 LPC, p3, k3, p6, 1/2 LPC, 1/1 RPC, p7, k3, p3, 3/2 RPC, p5.
Row 27: P7, 3/2 LPC, 3/1 RPC, p5, MK, p2, 1/2 RPC, p7, 3/1 LPC, 3/2 RPC, p7.
Repeat rows 1-28.
Abbreviations:
1/1 RC: Skip the first stitch, knit the second stitch, then knit the skipped stitch. Slip both stitches from the needle together.
1/1 LC: Skip the first stitch, knit through the backloop the second stitch, then knit the skipped stitch. Slip both stitches from the needle together.
1/2 LPC: Slip st to CN and hold in front, P2, then K1 from CN.
1/2 RPC: Slip 2 sts to CN and hold in back, K1, then P2 from CN.
3/3 LC: Slip 3 sts to CN and hold in front, K3, then K3 from CN.
3/3 RC: Slip 3 sts to CN and hold in back, K3, then K3 from CN.
3/1 LPC: Slip 3 sts to CN and  hold in font, P1, then K3 from CN.
3/1 RPC: Slip 1 st to CN and hold in back, K3, then P1 from CN.
3/2 LPC: Slip 3 sts to CN and hold in font, P2, then K3 from CN.
3/2 RPC: Slip 2 sts to CN and hold in back, K3, then P2 from CN.
Knitted Cable Panel Pattern 35, its FREE
Advanced Cable Knitting Pattern Free*